Official website · morstone.wales · Swansea · South Wales & beyond01792 722 872
ONE BRIEF · ONE PROGRAMME · ONE ACCOUNTABLE GROUP◆CLEAR SCOPE · CLEAR RESPONSIBILITY◆CONSTRUCTION · ELECTRICAL · PLUMBING & HEATING◆PLANNED MAINTENANCE & CAPEX SUPPORT◆START A PROJECT · 01792 722 872◆
The Castle Hotel Cardiff, 6 High Street, Cardiff
Existing-condition survey

PROJECT 02 · Commercial redevelopment

The Castle Hotel Cardiff

A landmark building and a complete redevelopment strategy for a 36-room boutique hotel in the heart of Cardiff.

A landmark building deserves a disciplined new chapter.

Explore the project ↓
ONE BRIEF · ONE PROGRAMME · ONE ACCOUNTABLE GROUP◆CLEAR SCOPE · CLEAR RESPONSIBILITY◆CONSTRUCTION · ELECTRICAL · PLUMBING & HEATING◆PLANNED MAINTENANCE & CAPEX SUPPORT◆START A PROJECT · 01792 722 872◆
Contract value£1.168m
Planned startNovember 2026
Programme6–8 months
Scope36-room boutique hotel

THE PROJECT

A landmark building. A complete redevelopment.

The strategy coordinates structure, compliance, services, interiors, furniture and handover within one controlled programme while respecting the building's historic urban character.

Historic fabric. Modern performance. Coordinated delivery.

Survey first. Sequence carefully. Keep the hotel vision intact.

THE CASTLE HOTEL · ARCHITECTURAL COORDINATION PACKAGEGENERAL ARRANGEMENT / ELEVATION / SECTION / DETAIL
Castle Hotel architect-style coordination sheet showing a typical bedroom floor, High Street elevation, protected corridor section and room module
Drawing CHC-A-210NTS @ A1Revision P01Design coordination
Live construction progress through the retained hotel corridorConstruction progressLive construction progress through the retained hotel corridor

THE PROJECT

A landmark building. A complete redevelopment.

The strategy coordinates structure, compliance, services, interiors, furniture and handover within one controlled programme while respecting the building's historic urban character.

Opening-up and temporary support works within the retained hotel structureConstruction progressOpening-up and temporary support works within the retained hotel structure

EXISTING FABRIC

Understanding what the building requires.

Opening-up works and site investigation reveal concealed conditions, legacy services and previous work so each package can be assessed before full delivery.

  • Demolition & enabling
  • Structure & fabric
  • Fire & acoustics
  • Mechanical & electrical
  • Interior finishes
  • FF&E & handover
Proposed room palette, joinery and lighting directionProposed visualisationProposed room palette, joinery and lighting direction

DESIGN INTENT

Rooms designed for comfort, durability and consistency.

A controlled room-type strategy brings finishes, joinery, lighting, sanitaryware and decorative elements into a repeatable hospitality specification. Images are proposed design direction, not completed photography.

PROJECT IN DEVELOPMENT

Restoring the building. Redefining the stay.

A landmark building and a complete redevelopment strategy for a 36-room boutique hotel in the heart of Cardiff.

Start a project conversation →
The Castle Hotel Cardiff — proposed project direction
Call DylanEmail Dylan
Menu